INFRASTRUCTURE

Infrastructure

CCS is equipped with the trendy and latest infrastructure. It fulfills the demand of a boarding / residential institution from all respect. The college’s infrastructure is always on the go and consistent improvement is made integral to the entire set up. Many minor and major nature of infrastructural works  are completed after the completion of phase-I till date.

Ser

Infrastructure / Facility

Phase-I

Phase-II

Remarks

  1.  

1 x Admin Block

completed

-

-

  1.  

4 x Academic Block

2 x completed

  • 1*xcompleted
  • 1 x planned

*Including state of the art IT Lab

  1.  

1 x Auditorium

-

completed

 

  1.  

1 x Library (to accommodate 30 x cadets)

-

completed

 

  1.  

1 x Mess (for 400 cadets)

completed

-

-

  1.  

1 x Staff Club

-

completed

Incl Mess and Ante Room

  1.  

Hostel for cadets

2 x completed

  • 1 x completed
  • 1 x planned

Each Hostel House 100 Cadets

  1.  

6 x JTR (G+2)

1 x completed

  • 3 STR (G+2)
  • 2 x planned

MOQs

  1.  

8 x MOQs

6 x completed

2 x completed

 

  1.  

1 x Amenity Block

-

completed

 

  1.  

1 x 32 Men SM Barrack

1 x completed

  • 1 x 64 Men SM Barrack GF (completed)
  • FF planned

For Junior Staff

  1.  

1 x Principal Residence

-

  • 1 x Vice Principal Residence (pending)
  • 4 x House Master’s Residence (pending)
  • 1 x MO Res (completed)

-

  1.  

4 x BOQs

-

completed

 

  1.  

Mini Hospital incl Ward

-

completed

2 Bedded Hospital (Upgraded up to 10 bedded  hostel)

  •  

1 x Mini Cafeteria / Canteen

-

1 x Mini Cafeteria / Canteen completed

Cafeteria for 200 individiuals is part of Phase-II construction work

  1.  

Barber Shop & Laundary

completed

-

Construction on adhoc basis. Major construction planned in Phase-II

  1.  

Sports Facilities Gymnasium incl Swimming pool

 

completed

  • 2 x Football Ground
  • 1 x Hockey Ground
  • 3 x Basketball Courts
  • 2 x Volleyball Courts
  • 1 x Cricket Ground

completed

  • 3 x Football Ground

 

Gymnasium incl Swimming pool is planned in Phase-II

  1.  

Mosque (700 men)

-

Planned

 

  1.  

Allied facilities

completed

Drill Square, OHWT (50,000 glns), Guest House

Planned

5 x Squash Courts Complex & 1 x Basketball Ground), Riding Club, OHWT (50,000 glns)